New Utility Application

Pipeline Occupancy Application (NCRR Form 220)

PROJECT INFORMATION

Proposed work involves


Existing Agreement for Installation?


Location of Installation:


Orientation of proposed pipeline installation:


For a transverse crossing under the tracks:

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Mainline – Increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)
H-Line – Increasing milepost from Greensboro (MP H-0) to Goldsboro (MP H-130)
EC-Line – Increasing milepost from Goldsboro (MP EC-0) to Morehead City (MP EC-94)
Feet

For a longitudinal occupancy only:

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Feet
Feet

For a longitudinal and transverse crossing:

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Feet
Feet
Feet

Will pipeline be located entirely within the confines of a public street?


Will the installation connect to an existing facility within the NCRR Corridor?


Feet
Feet
Feet
Feet

Feet
Feet
Feet
Feet

Are there any wires, poles or obstructions to be relocated?


Will temporary track support or rip rapping be required?


Shut-off valves:


Vents:


Seals:


Any existing facilities to the abandoned or removed:


Character of subsurface material:


Approximate ground water level:


Source of information on subsurface information:


Proposed construction:


Pipe Data

(psi)
(psi)

Pipe data:

CARRIER PIPE CASING PIPE

Files Uploads

.pdf, .cad or .doc upto 100 MB

.pdf, .cad or .doc upto 100 MB
.pdf upto 100 MB

Applicant’s Checklist

The following is a checklist of items that shall be completed when submitting this application for a proposed Pipeline Occupancy of the NCRR Corridor. Please place a check by all items listed below once they are included with the application package. For more detailed descriptions of the requirements below see Form NCR 102.

Application Package to Include:


Plan and Profile Submittal Requirements


General Plan View Requirements


Additional Plan View Requirements for Aerial Transverse Crossings and Longitudinal Occupancies


General Profile View Requirements


Additional Profile View Requirements for Underground Transverse Crossings


Additional Profile View Requirements for Underground Longitudinal Occupancies


If application is approved, applicant agrees to reimburse the North Carolina Railroad Company and the Operating Railroads for any cost incurred by the North Carolina Railroad Company and the Operating Railroads incident to installation, maintenance, and/or supervision necessitated by this pipeline installation, and further agrees to assume all liability for a ccidents or injuries which arise as a result of this installation.