New Utility Application

Wire/Conduit/Cable Occupancy Application (NCRR form 210)

PROJECT INFORMATION

Proposed work involves (check all that apply)

Existing Agreement for Installation?

*Please include with the application a copy of the existing agreement between the applicant and North Carolina Railroad and/or Norfolk Southern Railway (or predecessors).


Location of Installation:


MP + Feet

*Please include with the application a copy of the existing agreement between the applicant and North Carolina Railroad and/or Norfolk Southern Railway (or predecessors).

Mainline – Increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)
H-Line – Increasing milepost from Greensboro (MP H-0) to Goldsboro (MP H-130)
EC-Line – Increasing milepost from Goldsboro (MP EC-0) to Morehead City (MP EC-94)


Orientation of proposed wireline installation:


For a transverse crossing under the tracks:

Feet

For a longitudinal occupancy only:

MP + Feet
MP + Feet
Feet
Feet

For a longitudinal and transverse crossing:

MP + Feet
MP + Feet
Feet
Feet
Feet

Type of proposed installation:


Installation is:


Conductors:

Material:





Will installation be located entirely within the confines of a public street?


Will the installation connect to an existing facility within the NCRR Corridor?


Method of proposed installation:


Facilities to be installed/utilized Type:

Type: Quantity: Nearest Distance to Centerline of Track:

*Show locations and dimensions on the drawings.


Proposed construction:


Underground Facilities

Feet





Bury depth:

Feet
Feet
Feet

Aerial Facilities

Feet



Feet

Feet

Feet

Feet

Feet

Fiber Optic Facilities


Files Uploads


Applicant’s Checklist

The following is a checklist of items that shall be completed when submitting this application for a proposed Wire/Conduit/Cable Occupancy of NCRR Corridor. Please place a check by all items listed below once they are included with the application package. For more detailed descriptions of the requirements below see Form NCR 101 “Specifications for Wire, Conduit and Cable Occupations of North Carolina RailroadCompany Property.”

Application Package to Include:


Plan and Profile Submittal Requirements


General Plan View Requirements


Additional Plan View Requirements for Aerial Transverse Crossings and Longitudinal Occupancies


Additional Plan View Requirements for Underground Transverse Crossings


Additional Plan View Requirements for Underground Longitudinal Occupancies


General Profile View Requirements


Additional Profile View Requirements for Aerial Transverse Crossings


Additional Profile View Requirements for Aerial Longitudinal Occupancies


Additional Profile View Requirements for Underground Transverse Crossings


Additional Profile View Requirements for Underground Longitudinal Occupancies


If the application is approved, the Applicant agrees to reimburse the North Carolina Railr oad Company and the Operating Railroads for any cost incurred by the North Carolina Railroad Company and the Operating Railroads incident to installation, maintenance, and/or supervision necessitated by this wireline installation, and further agrees to assume all liability for accidents or injuries which arise as a result of this installation.