New Utility Application

Wire/Conduit/Cable Occupancy Application (NCRR form 210)

PROJECT INFORMATION

Proposed work involves


Existing Agreement for Installation?


Location of Installation:


Orientation of proposed wireline installation:


For a transverse crossing under the tracks:

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Mainline – Increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)
H-Line – Increasing milepost from Greensboro (MP H-0) to Goldsboro (MP H-130)
EC-Line – Increasing milepost from Goldsboro (MP EC-0) to Morehead City (MP EC-94)
Feet

For a longitudinal occupancy only:

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Feet
Feet

For a longitudinal and transverse crossing:

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Feet
Feet
Feet

Installation is:


Type of proposed installation: Check all applicable options


Conductors:

Material:


Material:


Fiber Optic Facilities





Will installation be located entirely within the confines of a public street?


Will the installation connect to an existing facility within the NCRR Corridor?


Feet
Feet
Feet
Feet
Feet
Feet

Feet

Facilities to be installed/utilized Type:

Type: Quantity: Nearest Distance to Centerline of Track:
Feet
Feet
Feet
Feet
Feet
Feet
*Show locations and dimensions on the drawings.

Proposed construction:

Files Uploads

.pdf, .cad or .doc upto 100 MB
Upload multiple files if needed.

.pdf, .cad or .doc upto 100 MB

.pdf upto 100 MB
.pdf, .cad or .doc upto 100 MB

.pdf, .cad or .doc upto 100 MB

Applicant’s Checklist

The following is a checklist of items that shall be completed when submitting this application for a proposed Wire/Conduit/Cable Occupancy of NCRR Corridor. Please place a check by all items listed below once they are included with the application package. For more detailed descriptions of the requirements below see Form NCR 101.


Plan and Profile Submittal Requirements


General Plan View Requirements


Additional Plan View Requirements for Aerial Transverse Crossings and Longitudinal Occupancies


Additional Plan View Requirements for Underground Transverse Crossings


Additional Plan View Requirements for Underground Longitudinal Occupancies


General Profile View Requirements


Additional Profile View Requirements for Aerial Transverse Crossings


Additional Profile View Requirements for Aerial Longitudinal Occupancies


Additional Profile View Requirements for Underground Transverse Crossings


Additional Profile View Requirements for Underground Longitudinal Occupancies


If the application is approved, the Applicant agrees to reimburse the North Carolina Railr oad Company and the Operating Railroads for any cost incurred by the North Carolina Railroad Company and the Operating Railroads incident to installation, maintenance, and/or supervision necessitated by this wireline installation, and further agrees to assume all liability for accidents or injuries which arise as a result of this installation.