PIPELINE OCCUPANCY APPLICATION (NCRR FORM 220)

This form is to be used when submitting a utility occupancy application for an underground pipeline. Use NCRR Form 210 for wire, conduit or cable occupancy applications.

Submit a cover letter, including a project description, and the completed application, application fee and one (1) copy of the project plans to:

HNTB North Carolina, P.C.
Attn: Manager, NCRR Pipes and Wires Occupancy Agreement Process
343 E. Six Forks Rd, Suite 200 Raleigh, North Carolina 27609

For NCRR / HNTB use only

123456
WEr123456

Plans for proposed installations are to be submitted to, and shall meet the approval of, North Carolina Railroad Company (NCR). Applicant shall enter into an occupancy agreement with NCRR before any construction activities commence on-site. Materials and installation are to be in strict accordance with specifications of the American Railway Engineering and Maintenance-of-Way Association (AREMA), North Carolina Railroad Company, and the Operating Railroads (Norfolk Southern Corporation and/or CSX Transportation as appropriate). The information submitted with this signed application and the required number of copies shall be per the Pipeline and Underground/Aerial Occupancy Application Instructions (NCRR Form 230). The engineering and application fees to be submitted with this application are as stated in the current engineering fee schedule (HN-02).

PROJECT OWNER/APPLICANT INFORMATION

Test
Test
Test
Test
Test
Test
Test
Test
Test
123456

Test
Test
Test
Test
Test
123456
test@test.com
1234567890
1234567890

Yearly

Corporation
Test

Name and address of the owner’s engineer or consultant (i.e. the party that will coordinate the project – leave blank if none or same as applicant)

Test
Test
Test
Test
Test
Test
123456
test@text.com
1234567890
Test

PROJECT INFORMATION

*Please include with the application a copy of the existing agreement between the applicant and North Carolina Railroad and/or Norfolk Southern Railway (or predecessors).



MP
+
Feet

*Please include with the application a copy of the existing agreement between the applicant and North Carolina Railroad and/or Norfolk Southern Railway (or predecessors).

Mainline – Increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)
H-Line – Increasing milepost from Greensboro (MP H-0) to Goldsboro (MP H-130)
EC-Line – Increasing milepost from Goldsboro (MP EC-0) to Morehead City (MP EC-94)


Feet

MP
+
Feet
MP
+
Feet
Feet
Feet

MP
+
Feet
MP
+
Feet
Feet
Feet
Feet







*Show locations and dimensions on the drawings.



Underground Facilities

Feet
Number empty:
Feet
Feet
Feet

Aerial Facilities

Feet
Feet
Feet
Feet
Feet
Feet

Fiber Optic Facilities

Applicant’s Checklist

The following is a checklist of items that shall be completed when submitting this application for a proposed Wire/Conduit/Cable Occupancy of NCRR Corridor. Please place a check by all items listed below once they are included with the application package. For more detailed descriptions of the requirements below see Form NCR 101 “Specifications for Wire, Conduit and Cable Occupations of North Carolina RailroadCompany Property.”

Application Package to Include:


Plan and Profile Submittal Requirements


General Plan View Requirements


Additional Plan View Requirements for Aerial Transverse Crossings and Longitudinal Occupancies


Additional Plan View Requirements for Underground Transverse Crossings


Additional Plan View Requirements for Underground Longitudinal Occupancies


General Profile View Requirements


Additional Profile View Requirements for Aerial Transverse Crossings


Additional Profile View Requirements for Aerial Longitudinal Occupancies


Additional Profile View Requirements for Underground Transverse Crossings


Additional Profile View Requirements for Underground Longitudinal Occupancies


If the application is approved, the Applicant agrees to reimburse the North Carolina Railr oad Company and the Operating Railroads for any cost incurred by the North Carolina Railroad Company and the Operating Railroads incident to installation, maintenance, and/or supervision necessitated by this wireline installation, and further agrees to assume all liability for accidents or injuries which arise as a result of this installation.