New Utility Application

Wire/Conduit/Cable Occupancy Application (NCRR form 210)

Proposed work


Existing Agreement


Location of Installation


Orientation of Installation


For a transverse crossing under the tracks

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Mainline – Increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)
H-Line – Increasing milepost from Greensboro (MP H-0) to Goldsboro (MP H-130)
EC-Line – Increasing milepost from Goldsboro (MP EC-0) to Morehead City (MP EC-94)
Feet
0° to 180 °

For a longitudinal occupancy only

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Feet
Feet

For a longitudinal and transverse crossing

MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
MP + Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Feet
Feet
0° to 180 °
Feet

Installation Information


Proposed construction