Dashboard
Settings
New Application #AP123458
Help
Notification
All caught up!
Justin Madigan
Applicant's Primary Contact
Cecilia Chapman
Applicant’s Primary Contact
Role
Applicant’s User
Email
cecilia@gmail.com
Phone
(257) 563-7401
Street Address
Ap #867-859 Sit Rd.
City
New York
State
New York
Zip
39531
New Utility Application
Pipeline Occupancy Application (NCRR Form 220)
Project Information
Step 1 of 4
Proposed work involves
*
Installation of a new facility
Revision to existing facility
Upgrade to existing facility
Revision and Upgrade to existing facility
Existing Agreement for Installation?
*
Yes
No
Unknown
Location of Installation
Nearest Stree
*
t
Nearest Town
*
County
*
United States
State
*
Alabama
Alaska
Arizona
Arkansas
California
Colorado
Connecticut
Delaware
District Of Columbia
Florida
Georgia
Hawaii
Idaho
Illinois
Indiana
Iowa
Kansas
Kentucky
Louisiana
Maine
Maryland
Massachusetts
Michigan
Minnesota
Mississippi
Missouri
Montana
disabledNebraska
Nevada
New Hampshire
New Jersey
New Mexico
New York
North Carolina
North Dakota
Ohio
Oklahoma
Oregon
Pennsylvania
Rhode Island
South Carolina
South Dakota
Tennessee
Texas
Utah
Vermont
Virginia
Washington
West Virginia
Wisconsin
Wyoming
Latitude
*
Longitude
*
Orientation of proposed pipeline installation
*
Transverse crossing only
Longitudinal (parallel to tracks) only
Longitudinal and transverse crossing
For a transverse crossing under the tracks
Railroad Line
*
Mainline
H-Line
EC-Line
Railroad Milepost Reference
*
MP
+
Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Mainline – Increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)
H-Line – Increasing milepost from Greensboro (MP H-0) to Goldsboro (MP H-130)
EC-Line – Increasing milepost from Goldsboro (MP EC-0) to Morehead City (MP EC-94)
Total Length of Crossing on the NCRR Corridor
*
Feet
Number of tracks to be crossed
*
Angle of crossing
*
0
°
to 180
°
For a longitudinal occupancy only
Railroad Line Begin
*
Mainline
H-Line
EC-Line
Begin at Railroad Milepost
*
MP
+
Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Railroad Line End
*
Mainline
H-Line
EC-Line
End at Railroad Milepost
*
MP
+
Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Total Length parallel on the NCRR Corridor
*
Feet
Min. distance from centerline of nearest track of longitudinal portion
*
Feet
For a longitudinal and transverse crossing
Railroad Line Begin
*
Mainline
H-Line
EC-Line
Begin at Railroad Milepost
*
MP
+
Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Railroad Line End
*
Mainline
H-Line
EC-Line
End at Railroad Milepost
*
MP
+
Feet
Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Total Length of Crossing on the NCRR Corridor
*
Feet
Total Length parallel on the NCRR Corridor
*
Feet
Total Length of Occupancy within the NCRR Corridor
*
Number of tracks to be crossed
*
Angle of crossing
*
0
°
to 180
°
Min. distance from centerline of nearest track of longitudinal portion
*
Feet
Will pipeline be located entirely within the confines of a public street?
*
Yes
No
Will the installation connect to an existing facility within the NCRR Corridor?
*
Yes
No
If yes, identify owner
*
Are there any wires, poles or obstructions to be relocated?
*
Yes
No
If yes, Type of facility
*
Owner
To be relocated by
Will temporary track support or rip rapping be required?
*
Yes
No
If yes, Type of facility
*
Shut-off valves
*
Yes
No
If yes, Type of facility
*
Vents
*
Yes
No
If yes, location
*
Number
*
Size
*
Height above ground
*
Seals
*
Yes
No
If yes, Bothends
*
One end
*
Any existing facilities to the abandoned or removed
*
Yes
No
If yes, explain
*
Character of subsurface material
*
Approximate ground water level
*
Source of information on subsurface information
*
Proposed construction
Start Date
Name of contractor
Duration
Days
Weeks
Months
Years
Define any special specifications of the installation
Pipe Data
Material to be conveyed
*
Flammable
*
Yes
No
Temperature
*
Maximum working pressure
*
(psi)
Field test pressure
*
(psi)
Type of test
*
Next Step
Facilities
Step 2 of 4
Files Uploads
Step 3 of 4
Applicant's Checklist
Step 4 of 4