Proposed Work

Revision and Upgrade to existing facility

Existing Agreement

Yes

Location of Installation

Test

Test

Alamance

United States

California

35.7596

79.0193

Orientation of Installation

Transverse crossing only

For a transverse crossing under the tracks

Mainline

284 MP

375 Feet

Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.
Mainline – Increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)
H-Line – Increasing milepost from Greensboro (MP H-0) to Goldsboro (MP H-130)
EC-Line – Increasing milepost from Goldsboro (MP EC-0) to Morehead City (MP EC-94)

375 Feet

2

3

For a longitudinal occupancy only

Mainline

284 MP

375 Feet

Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.

H-Line

284 MP

375 Feet

Use the next lowest whole milepost adjacent to the project location + feet in the direction of increasing milepost to the project location.

3 Feet

375 Feet

Installation Information

Distribution

Yes

Installation Connect

Yes

Proposed construction

2021-03-21

Sudhir

2

Weeks

Aenean in luctus risus. Praesent sodales eget felis placerat fringilla. Phasellus vel velit imperdiet, pulvinar nibh quis, imperdiet ex. Morbi ac diam nibh. Morbi laoreet vehicula ultricies. Phasellus non semper massa, porttitor elementum felis. Morbi at porta lectus.

1

Aerial Facilities

2 Feet

3

test

3 Inch

3

2 Feet

2 Feet

2 Feet

2 Feet

2 Feet

Underground Facilities

Bore and Jack

Carriers, Conduits and Wires

Carrier #1

2 Feet

2 Feet

2 Feet

2 Feet

Conduits #1

3

4 Inches

5 Inches

3 Cable TV wires, 2 Fiber Optic wires


Carrier #2

2 Feet

2 Feet

2 Feet

2 Feet

Facilities to be installed/utilized Type

Type: Quantity: Nearest Distance to Centerline of Track:

3

23 Feet

2

23 Feet

Design and Construction Plans

xyz133
xyzfdgd

Specifications and Computations

qwer

Existing Agreements

qwer

Pipe Data Sheet

qwer

Soil borings

qwer

Plan and Profile Submittal Requirements

General Plan View Requirements

Additional Plan View Requirements for Aerial Transverse Crossings and Longitudinal Occupancies

Additional Plan View Requirements for Underground Transverse Crossings

Additional Plan View Requirements for Underground Longitudinal Occupancies

General Profile View Requirements

Additional Profile View Requirements for Aerial Transverse Crossings

Additional Profile View Requirements for Aerial Longitudinal Occupancies

Additional Profile View Requirements for Underground Transverse Crossings

Additional Profile View Requirements for Underground Longitudinal Occupancies