PROJECT INFORMATION

10.Proposed work involves (check all that apply)
Exiisting Agrrement for installation?

Please include with the application copy of the existing agreement between applicant and north Carolina Railroad and/or Norfolk southern Railway(or Predecesores).

11.Location of installation

Feet

* Use the next lowest whole milepost adjecent to the project location + feet in the direction of increasing milepost to the project location.Applies to all milepost references in the application.

Mainline-increasing milepost from Greensboro (MP 284) to Charlotte (MP 375)

H-Line-increasing milepost from Greensboro (MP H-0) to Goldsbro (MP H-130)

EC-Line-increasing milepost from Goldboro (MP EC-0) to Morehead (MP EC-94)

13. Orientation of proposed pipeline installation :

Feet
Feet
Feet
Feet
Feet

16.For a longitudel and transverse crossing :

Feet
Feet
Feet
Feet
Feet

17.Will pipline be located entirely within the confies of a public street ?

18.Will the Insttalation connect to an existing facility within the NCCR Corridor ?

19. Method of proposed Insttalation

20. Are there any wires,poles or obstructions to be relocated ?

21.Will temporary track support or rip rapping be required ?

22.Shut off values?

23.Vents ?

24.Seals ?

25.Any existing faciliies to be abonded or removed ?

29.Proposed construction

Underground faciliies

30.Totl buried length on the NCCR corridor:

Feet

31.Buy depth

Feet
Feet
Feet

Aerial faciliies

Feet
Feet
Feet
Feet

Pipe data

Flammable

39. Maximum working pressure :

(psi)

Feild test pressure :

(psi)

40.Pipe data ( still include from NCR 102 plate i):

CARRIER PIPE

CASING PIPE

Material

Process of manufacture

Matrial specifications

Matrial Grade

Minimum yeild strengh (psi) of

Matrial

Mill Test pressure (psi)

Nominal Diameter

Inside Diameter

Outside Diameter

Weight per Foot

Wall Thickness

Type of seam

Laying lenghts

Type of joints

Type of Coating

Cathodic protection Details

Protacive Coating Details