Dashboard
Settings
New Application
Help
Notification
Notification
Cecilia Chapman
is some content from a media component. You can replace this with any content and adjust it as needed.
08/04/2021
Cecilia Chapman
is some content from a media component. You can replace this with any content and adjust it as needed.
08/04/2021
ToDo
HNTB Representative
Waiting for approval
08/04/2021
Cecilia Chapman
is some content from a media component. You can replace this with any content and adjust it as needed.
Cecilia Chapman
Applicant's Primary Contact
Cecilia Chapman
Applicant’s Primary Contact
Role
Applicant’s User
Email
cecilia@gmail.com
Phone
(257) 563-7401
Street Address
Ap #867-859 Sit Rd.
City
New York
State
New York
Zip
39531
New Utility Application
Wire/Conduit/Cable Occupancy Application (NCRR form 210)
Project Information
Step 1 of 4
Facilities
Step 2 of 4
Files Uploads
Step 3 of 4
Design and Construction Plans
Upload design and construction plans including plan view, profile view and cross section view of the proposed facility
*
.pdf, .cad or .doc upto 100 MB
Upload multiple files if needed.
Plans clearly show the extent of proposed work affecting the NCRR Corridor
Plans drawn to scale
Plans signed by a Professional Engineer licensed in the State of North Carolina
No aerial background shown on plans
Specifications and Computations
Upload specifications and computations for the proposed occupancy
*
.pdf, .cad or .doc upto 100 MB
Signed by a Professional Engineer licensed in the State of North Carolina
Existing Agreements
Upload existing agreement between the applicant and North Carolina Railroad and/or Norfolk Southern Railway (or predecessors).
*
.pdf upto 100 MB
Pipe Data Sheet
NCR102 Plate I:
Pipe Data Sheet
*
.pdf, .cad or .doc upto 100 MB
Soil borings
NCR 102 Section 3.1
Soil borings
*
.pdf, .cad or .doc upto 100 MB
Next Step
Applicant's Checklist
Step 4 of 4
Carrier
Total buried length on the NCRR Corridor:
Feet
Number empty:
Number filled:
Conduit
Number of cables or lines in each conduit:
Feet
Number of conductors in each cable or line:
Encasement Material:
Outside diameter:
Wall thickness:
Wireline voltage:
Volt
Bury depth from base of rail to top of casing:
Feet
Bury depth below ditches:
Feet
Minimum depth on the NCRR Corridor but not beneath tracks:
Feet
Number of wire
Add Wire
Wire Type:
Number of conductors:
Material:
AWG Gauge:
Cable TV
2
Copper
2
Fiber Optic
2
Copper
2
Type of Wires
Cable TV
Number of conductors:
Material:
Copper
Aluminum
AWG Gauge:
Telephone
Number of conductors:
Material:
Copper
Aluminum
AWG Gauge:
Electric Power
Number of conductors:
Material:
Copper
Aluminum
AWG Gauge:
AC
DC
Voltage:
No. of Phases:
Amperes:
Hertz:
Maximum voltage:
Maximum Current:
Maximum fault to ground current:
Communications
Number of conductors:
Material:
Copper
Aluminum
AWG Gauge:
Fiber Optic
Fiber Cables Count:
AWG Gauge:
Number of fibers per cable:
Identify each intended user of the conduit/cable:
Other
Please Specify: